The City of Casey has an adopted On-Site Stormwater Detention (OSD) Policy.

The OSD Policy requires control of the rate of stormwater discharge from a development site to prevent any adverse impact on downstream properties.  This requirement can apply to all storm events up to and including the 100-year ARI event.

The need for an OSD system is assessed by Council upon receipt of a planning application and will be included as a condition on the planning permit issued by Council.

OSD Design Guidelines and Checklist

The design of the OSD system must be to the satisfaction of Council.

The OSD Design Guidelines will assist applicants to design an OSD system in accordance with Council’s requirements.

Onsite Stormwater Detention - Design Guidelines and Checklist (298kb)

Submission Form

Applicants must complete the Submission of Drainage Plans form and submit either two hard copies or a PDF electronic copy of the OSD design plans to Council by email to caseycc@casey.vic.gov.au or by mail.

Submission of Drainage Plans (217kb)

Submission of Drainage Plans (331kb)

Submissions must be addressed to:

Stormwater Management Team
Engineering and Asset Management Department
City of Casey
PO Box 1000
Narre Warren  VIC  3805